
The cabinet build continued, this time with the dishwasher in place. I primed the upper cabinets on one side of the kitchen in the morning and then I sanded it and hit it with the first coat of paint this evening. We'll do the other side when the dishwasher is in place. Todd took

over the cabinet doors project and got about halfway through painting the fronts. But most of the day was spent going to various Home Depots looking for the other countertop, a ten foot right hand mitered countertop that took us to Everett, Somerville, and Watertown. The three hours of driving around and shopping were followed by an hour of getting the printer back online to print out the new rental agreement for the tenants. Today has been a long, long, day and the last time we ate was a little over 12 hours ago. Time for a break!!!
No comments:
Post a Comment